Close-out guide
Review site work before equipment and materials leave
A short, documented close-out walk helps separate incomplete scope, final adjustments, maintenance, and work assigned to another provider.
Compare the site to the written scope
Walk each work area and confirm excavation limits, grade, drainage path, material placement, hauling, access restoration, and cleanup.
Check water movement when practical
Review inlets, outlets, swales, downspout connections, pipe ends, and visible low areas. Some drainage performance can only be evaluated during suitable weather.
Record surfaces and protected areas
Photograph driveways, lawns, structures, utilities, fences, landscaping, and staging areas that were included in protection or restoration responsibilities.
Separate adjustments from maintenance
Identify immediate corrections, owner maintenance, settling or weather monitoring, manufacturer issues, and work outside ROEβs written scope.
Keep warranty information together
Save the signed scope, change orders, completion photos, product documents, and warranty contact information. Waterproofing, water-damage repair, and deck workmanship terms follow the approved ROE warranty record.
Use this guide with your estimate request
Send each concern with its exact location, a wide photo, a close photo, and the expected result. That makes warranty or close-out review faster and clearer.
