Material planning

Compare site-work materials by function, exposure, and maintenance

Material selection should follow the load, drainage, soil, slope, access, appearance, and maintenance needs of the actual property.

Gravel and aggregate

Compare size, compaction, drainage, dust, traffic, edge restraint, and future maintenance. A driveway base, drainage stone, and finished walking surface do not perform the same job.

Drainage pipe and water-control components

Pipe type, diameter, slope, outlet, fittings, cleanouts, filter fabric, and surrounding stone should match the drainage plan and site conditions.

Waterproofing and repair assemblies

Membranes, coatings, drainage layers, protection board, backfill, and related products must be selected as a complete assembly. Product warranties remain separate from ROE workmanship coverage.

Deck and site-preparation materials

For deck-related work, identify the ground preparation, drainage, footing or access needs, and which materials belong to ROE versus another provider.

Use this guide with your estimate request

Bring product information you already have, but avoid ordering until measurements, quantities, access, site conditions, and the responsible installer are confirmed.

Request an estimate